HOME CONTACT CAREER
 

TURBOMACHINERY SERVICES


PT Torishima Guna Engineering builds The Turbomachinery Services Workshop which is located in MM2100 Industrial Area.

TorishimaGuna Turbomachinery Services Workshop stands on :
-  Land Area                           :   15,000 square meters, 1.5 hectars
-  Workshop Space                :   2,160 m2 (30m x 72m)
-  Workshop                           :   height 15 meters, effective hight 10 meters
-  Office Space                       :   864 m2
-  Overhead Crane Capacity  :   40 T, to be upgraded to 50 T
-  Electricity                            :   1 MW

FEATURES

Machinery (Main)
1.  Balancing Machine : 32 T to be upgrade to 50 T
2.  Horizontal Lathe Machine : Bed 12 m, Swing Over Bed 4 m

Equipment to be Serviced
1.  Gas Turbines (Solar, GE & Aeroderivatives)
2.  Steam Turbines
3.  Driven Equipments : Generators, Compressors, Gearboxs
4.  Pumps

Scope of Services in the Workshop
1.  Balancing
2.  Component Repair
3.  Parts Fabrications
4.  Exchange Program (for Solar Turbines)
5.  Retrofit Control System

Maximum Capacity for Turbines
1. Rotor Weight up to 50 T
2. Max. Length 12 meters
3. Max. Diameter 3,8 meters

Maximum Capacity for Pumps
Power 15,6 MW

Rotating Equipment Services
1.  Installation & Commisioning
2.  Operating & Maintenance
3.  Overhaul and Repair on Site
4.  Repair & Refurbishment
5.  Upgrades or Modifications
6.  Retrofit Control System
7.  Preventive & Predictive Maintenance
8.  Parts / Module Repair
9. Troubleshooting & On Call Services
10.  Exchange Program for Solar Turbines

B
y building this Turbomachinery Services Workshop, Torishima Guna Engineering Company is expected to be the one of companies in maintenance and repairing rotating equipment with cost effective and excellent quality.
Copyright © 2011 TorishimaGuna - All rights reserved. Design, Art and Created by TorishimaGuna Team.